You are here

Oman

CLIENT

DATE

LOCATION

DESCRIPTION

Salalah Methonal/DONG IL Industry

2008

Ghala

PWHT of Tank Shell Plates

PDO/Arabian Industries

2008

Rusayl

PWHT of FWKO Separators

Occidental/Seeh Al-Sarya Trading LLC

2008

Safah

NDT on 12” x 16.3Km Pipeline

PDO/Arabian Industries/Petrofac

2008-Ongoing

Sohar Fabshop-Harwell

NDT, PWHT Pipe Spools Harwell ClusterPhase II

PDO/Arabian Industries

2007

RusaylFab shop

NDT, PWHT (GasFurnace) Musalim Separator.

PDO/Arabian Industries/Petrofac

2007

Rusayl-MuscatFab Shop

NDT, PWHT (Internal Gas Firing) 4.2mx24mx 62mm Separator

Occidental/TOCO

2006-Ongoing

Mukhaizna

NDT/PWHT-Flow Lines and Station Piping

TOCO

2006-2007

Kautherpipelines for PDO

NDT on 18" X 104 kms and 36"X80 Kms Pipelines-Including Film Digitisation.

Arabian Industries

2006

Muscat

PWHT-Pressure Vessels-Electrical Furnace

Oman Steel Co.

2006

Muscat

PWHT-External Gas Firing (Furnace) for 2x Steam Drums

Arabian Industries

2006

Muscat

PWHT-Electrical Furnace,Suction Surge Vessel

United Engineering Service

2005

Muscat

PWHT-ElectricalFurnace, JGC Vessels-10 nos,

Arabian Industries

2005

Muscat

PWHT-External Gas Firing (Furnace),JGC Vessels 3nos,

Arabian Industries

2005

Muscat

PWHT-Electrical Furnace-Pressure Vessels

Arabian Industries

2005

Muscat

PWHT-Internal Gas Firing-Pressure Vessels

Special Technical Services

2005

Muscat

PWHT-Electrical Furnace-Pressure Vessels

OGC / Dodsal

2003 / 2004

BuraimiMahdah to Al-Ain PipelineProject

NDT-24” dia Pipeline 45 Kms

OXY / TOCO

2003 / 2004

Safah Northern Oman Gas Project

NDT-16” dia pipeline 93 Kms, 12” dia 68Kms & 4” dia 13 Kms

OXY / Dodsal

2003 / 2004

SafahNorthern Oman GasProject–Facilities Expansion

NDT-Pipe Spools.

OMIFCO / CCC

2003 / 2004

Sur

NDT-Pipe Spools

United Engineering Services

2003 / 2004

Muscat

NDT-Annual Call Off Contract

Arabian Industries

2003 / 2004

Muscat

NDT / PWHT-Annual Call Off Contract

PDO /TOCO

2002/2003

Main OilLine (Various)

NDT/PWHT-ValveReplacement

UES(Hitachi / PDO)

2002/2003

Various

NDT-CallOff Contract

PDO /Halliburton

2002/2003

Various

NDT-CallOff Contract

PDO

2002/2003

Muscat

MFL (TankFloor Mapping)

Elco (PDO/ ORC / Shell / MOD)

2002/2003

Various

NDT-CallOff Contract

PDO / TOCO

2004

Lekhwair EPC Dhulaima and Lekhwair-B toLPS pipeline

NDT-16” dia 35 Kms pipeline

PDO / Arabian Industries

2004

Rusayl 3 Phase Burhaan Separator(V6910)

PWHT by Internal firing method & NDT on Pressure Vessel

PDO / Arabian Industreis

2004

Barik /Rusayl Barik Central Gathering Station Construction

NDT & PWHT Pipe Spools

Oman Refinery Co

2004

MAF, Muscat

NDT Annual Call Off Contract

Oman Refinery Co

2004

MAF, Muscat

MFL (Tank Floor Mapping)

Haliburton

2004

Various sites through out the Sultanate.

NDT Annual Call Off Contract

PDO

2004

MAF, Muscat

MFL (Tank Floor Mapping)

OmanSteel

2004

Muscat

PWHT onTank Cleanout Doors

Oman Steel

2004

Muscut

NDT & PWHT on Skid Mounted Crude OilField Manifolds for SouthOil Co., Iraq

Arabian Industries

2004

Muscat

PWHT Internal Gas Firing, Separator

Arabian Industries

2004

Muscat

PWHT Internal Gas Firing, Separator

LahoudEngg (Enel Power)

2002

BarkaPower Plant

NDT/PWHTPipe Spools

OmanSteel (PDO / Hitachi)

2002

South OilCo.

PWHTPiping Manifold

PDO / AlTurki

2001/2005

Various

NDT/PWHTCall Off Contract.

OGC /Dodsal

2001/2002

OGC/99/01

NDT 24" Dia Pipeline x 700 Kms

OGC /Saipem CCC

2001/2002

OGC/99/02

NDT 32" Dia Pipeline x 300 Kms

PDO /Galfar

2001/2002

C-2K-8002

NDT/PWHT Call OffContract

PDO /TOCO

2001

Fahud-Natih

NDTEmergency Pipeline-8" x 27 Kms

M.I.S.(PDO / ORC)

2001

Various

NDT /PWHT Call Off Contract

PDO /TOCO

1999

C88091

LNG-SOGLPipeline-10" dia 5 Kms (NDT Crawler)

PDO /Saipem CCC

1998-1999

C-580043

LNGUpstream Facilities (NDT & PWHT of pipe spools)

OMAN LNG-AGEC / DYNIDAG

1998

OMAN LNG

PWHT & UT on Sphere

PDO /Arabian Industries

1997-2001

Various

NDT & PWHT-North Oman Service Contract (4 years)Thirdparty Inspection

PDO /Dodsal

1997-2000

Various

LNGUpstream Gathering system interfield & GGS interlink pipelines –NDT and Third Party Inspection 16", 32", 14", 28",20", 12" & 8" dia CS & DSS flowlines) Total 274.2 KM

PDO /Saipem CCC

1997-1998

C-580045

NDT48" dia Pipeline x 365 Kms-LNG Downstream Gas Supply

PDO /TOCO

1997-1998

C680061

Pipelinesof various dia-6", 8", 10" & 12"NDT and Third PartyInspection. Total 139.6 KM.